• Dream big. Set goals. Take action.

    Dream big. Set goals.
    Take action.

    The big bang was the moment of the Creation,
    and therefore the work of God

    • Dream big. Set goals. Take action.
    • Quality
    • Moment
    • Perfection
    • Time
  • Quality

    Quality

    Quality is not an accident, it’s the result of an intelligent effort

    • Dream big. Set goals. Take action.
    • Quality
    • Moment
    • Perfection
    • Time
  • Moment

    Moment

    Every moment is precious to those who know the value of time

    • Dream big. Set goals. Take action.
    • Quality
    • Moment
    • Perfection
    • Time
  • Perfection

    Perfection

    Perfection consists not in doing extraordinary things,
    but in doing ordinary things extraordinarily well

    • Dream big. Set goals. Take action.
    • Quality
    • Moment
    • Perfection
    • Time
  • Time

    Time

    The best time to start was yesterday.
    The next best time is now.

    • Dream big. Set goals. Take action.
    • Quality
    • Moment
    • Perfection
    • Time

Portfolio

Proudly serving our clients for:19 years, 3 months, 3 weeks, 5 days, 23 hours, 33 minutes ago
  • Hermes Business Center

    Hermes Business Center Corp A – Stage

    Executed works: partitions brick, masonry blocks plaster, plasterboard walls, waterproofing, tile cladding tiles, plasters, thermal insulation, painting

    started in May 2016

  • Airbus Ghimbav

    Airbus Ghimbav – Industrial Hall

    Aeroportului Street, No 1A, Ghimbav, Brasov County. Executed works: plasterboard walls and ceilings , coffered ceilings , painting , dry plaster , plastering , reinforcement , raised floors .

    Project in execution, started in May 2016

  • PWTP Suplacu de Barcau

    PWTP Suplacu de Barcau – OMV Petrom Crisana Banat, Suplacu de Barcau, Bihor County

    Executed works: drywall partitions, ceilings, drywall ceilings, screeds, masonry, painting, mechanized plasters, thermosystems, ceilings, leveling compound.

    started in May 2016

  • Oregon Park

    Oregon Park – Office ensemble property, made up of two buildings (2B+GF+6F)

    Executed works: professional drywall systems, drywall paintings, plaster paintings, mechanized plasters.

    started in October 2015

  • Gara Herastrau Office Building

    Gara Herastrau – Office building and parking (3B+GF+11F+1T)

    Executed works: plasterboard walls and ceilings, coffered ceilings, lamellar ceilings, drywall paintings, plaster paintings, mechanized plasters, decorative plasters, floating floors.

    November 2015 – July 2016

  • Green Court Bucharest

    Offices class A, Bucharest

    Drywall claddingf. Two buildings: GF + 12 levels and 3 underground parking levels, and second: GF + 12 levels and 3 underground parking levels

    Nov. 2013 – Sept. 2015

  • Bellevue Copou

    Apartment building, Iasi

    Interior partitions of brick and drywall, plasters, paintings, decorative plastering, cladding walls and ceilings, mounting tiles and parquet, thermal facade.

    March 2015 – June 2015

  • Bucharest Business Park

    Office ensemble property, made up of four buildings, Bucharest

    interior partitions of brick and drywall, cladding walls and ceilings.

    March 2005 – September 2006

  • Tower Center Office

    Office Building, Bucharest

    Professional drywall systems, drywall paintings, plasterboard walls with single/double/triple plating, dry plastering, floating floors

    January 2007 – September 2007

  • West Logistic Park

    Office Buildings and industrial spaces Bucuresti-pitesti Highway,

    Professional drywall systems, plasterboard walls with a height of 12 m

    November 2006 – February 2007

  • Caderea Bastiliei

    Residential building B+GF+5F+6R

    Professional drywall systems, drywall paintings, plasterboard walls, ceilings

    March 2008 – May 2009

  • Cartier german Residenz

    Residential complex Banatului Road, No.14, Chitila, Ilfov County

    Drywall systems and paintings for Phase III of the development – 3 buildings and Phase IV – 8 buildings

    September 2008– April 2009

  • City Center Residence

    Residential complex, Bucharest

    Drywall soffits, ceilings, walls, drywall partitions and cladding.

    March 2006 – September 2007

  • Dental Med

    Commercial space, Bucharest

    For the whole project ADMA Grup was the only specialist contractor for interior finishing : plasterboard ceilings and suspended level, coffered mineral fiber ceilings, paintings, plasters , screeds , assembly tiled floors , walls cladding with HPL Trespa.

    June 2010 – May 2011

  • FeliCity

    Residential complex, Bucharest

    Plasterboard walls (8.000 sqm) and suspended ceilings (1.600 sqm), plasters (22.300 sqm), plasterings (33.400 sqm), paintings (34.500 sqm).

  • Ford Daventry College

    Industrial hall Ford Royal Oak Way South Ind Est Daventry, UK

    Plasterboard walls on metal structure, ceilings, interior finishing

    February 2015 – June 2015

  • Green Vista

    Residential complex, Ilfov

    Drywall systems, partition walls, cladding walls with drywall, ceilings, soffits, gypsum masks, other systems; painting works; PAL cladding walls in the lobby area ( staircase ); ventilated facade system made of HPL fixed EUROFOX colored rivets

    May 2008 – Aprilie 2012

  • Minovici

    Residential house B+GF+4F+attic

    Drywall partitions and cladding , paintings.

    November 2007 – March 2009

  • New Town Residential

    Residential building Bucharest

    Drywall partitions and cladding with gypsum and finishing works ( grouting and painting ), plasters, facade

    June 2011 – April 2012

  • Sema Parc

    Office buildings class A

    Professional installation of drywall systems, (walls , ceilings, soffits, smokescreen, masks, parapets ); paintings; raised technical floors – MDF and SCA; ceilings and hanging drywall level, coffered mineral fiber ceilings; moldings.

    July 2007 – August 2009

  • Tipografilor S-Park

    Office Buildings

    Partition walls, cladding walls with drywall ( 3,500 sqm ), suspended ceilings ( 4,000 sqm), assembly coffered ceilings (5,000 sqm), HS 50 TEKTALAN thermal installation for ceiling mounting raised technical floor

    September 2006 – June 2007

  • Porsche Showroom

    Commercial space Pipera-Tunari Road, Ilfov

    Professional drywall systems, coffered mineral fiber ceilings, paintings, dig and floors.

    November 2012 – February 2013

  • FCC Office Building

    Office Building, Bucharest

    Professional drywall systems, partition walls, cladding drywalls, ceilings, bullet-proof wall

    February 2012 – December 2012

  • E.ON Targu Mures

    Office building Class A, B+GF+8F+T, Targu Mures

    Professional drywall systems, drywall soffits, ceilings, walls, groutings, paintings.

    July 2015 – October 2015

  • SUA Embassy

    Ambasada SUA – special project

    Executed works: cladding walls with drywall, plasterboard walls and ceilings wool, dry plaster , manual and mechanized, ceilings and laminated, paintings, plasterings, ceramic tiles, polystyrene on interior walls.

    June 2010 – May 2011

  • Gebauer & Griller Balti

    Gebauer & Griller Balti – Industrial hall

    Executed works: professional drywall systems, metal coffered ceilings,paintings, dig and floors, flooring underlay over dig, tiles instalation.

    February 2013 – December 2013

  • Peek & Cloppenburg

    Peek & Cloppenburg – Commercial space

    Executed works: professional drywall systems ( partition walls, cladding walls with drywall, ceiling)

    April 2013 – July 2013

  • VCST Alba Iulia

    VCST Automotive Production Alba

    Calea Ciugudului Street, No. 9, Alba Iulia, Alba County

    General Contractor: INDEC RO

    Executed works: plasterboard walls on metal structure, ceilings, waterproofing, painting works, Dry plasters.

    Project: developed during March 2017 – June 2017

  • LIDL Offices

    LIDL OFFICES – Company headquarters

    Alexandru Serbanescu Street, No. 58, District 1, Bucharest

    General Contractor: SKANSKA CONSTRUCTION ROMANIA

    Executed works: drywall systems (partition walls, cladding walls with drywall, ceilings, soffits, masks, other systems drywall, flooring and interior), grouting, masonry structures

    Project: developed during November 2016 – June 2017

  • The Mark – Grivita TOWER

    The Mark – Grivita TOWER

    Buzesti Street, No. , District 1, Bucharest

    General Contractor: STRABAG

    Executed works: Raised floor, Interior partitions walls, Multilayered walls, ceilings and plastering works, painting works, dry plaster.

    Project: in execution, started in June 2017

  • ONE Charles de Gaulle Residence

    The Mark – Grivita TOWER

    Daniel Rosenthal Street, No. 39, District 1, Bucharest

    General Contractor: STRABAG

    Executed works: Interior partitions walls, Multilayered walls, ceilings and plastering works, painting works, dry plaster.

    Project: in execution, started in May 2017

“It’s not the beauty of a building you should look at,
it’s the construction of the foundation that will stand the test of time“

Our success is fueled by our commitment to creating a balanced workplace that attracts and retains the best employees in every field. We are proud of the dedication, skill, and integrity of each of our employees, and their unique contributions in building our high performance teams.

We have built our reputation by performing the highest quality work and providing the most innovative solutions on the widest range of demanding and high profile projects.

We have the experience, knowledge and commitment to provide products and services that are unique to each project. We want our customers to view Adma Grup not only as a contractor but as a genuine partner who is dedicated to helping you accomplish all of your project goals.

We continuously review and refine our systems, processes and procedures in order to deliver an unparalleled level of excellence in the industry. Our unique and flexible project management systems ensure that a positive outcome is achieved regardless of size or nature of the project.

As your contractor,

We provide a complete package of integrated services: all materials, labour, equipment and management tools. This interactive approach ensures quality workmanship and attention to detail every step of the way and a finished structure you can be proud of.

Our commitment is to establish lasting relationships with our customers by exceeding their expectations and gaining their trust through exceptional performance by our construction team.

The results speaks for themselves.

Partners

Rigips
Hilti
Apla
Fabry Atlas
Knauf
Baumit