{"animation":"smooth","circlewidth":"0.06","backgroundwidth":"1.2","backgroundcolor":"#313332","is_days":"1","daysbackgroundcolor":"#ec6e0e","is_hours":"1","hoursbackgroundcolor":"#36b0e3","is_minutes":"1","minutesbackgroundcolor":"#75bf44","is_seconds":"1","secondsbackgroundcolor":"#66c5af","days_text":"Days","hours_text":"Hours","minutes_text":"Minutes","seconds_text":"Seconds"}

Hermes Business Center A

Hermes Business Center Corp A – Stage

Dimitrie Pompeiu Boulevard, No. 5-7, district 1, Bucharest

General Contractor: OCTAGON CONTRACTING & ENGINEERING

Executed works: partitions brick, masonry blocks plaster, plasterboard walls, waterproofing, tile cladding tiles , plasters , thermal insulation , painting

Project: developed during May 2016 – May 2017

Airbus Ghimbav

Airbus Ghimbav – Industrial Hall

Aeroportului Street, No 1A, Ghimbav, Brasov County

General Contractor: INDEC RO

Executed works: plasterboard walls and ceilings , coffered ceilings , painting , dry plaster , plastering , reinforcement , raised floors .

Project: developed during May 2016 – February 2017

PWTP Suplacu de Barcau

PWTP Suplacu de Barcau – OMV Petrom Crisana Banat, Suplacu de Barcau, Bihor County

OMV Petrom Crisana Banat, Suplacu de Barcau, Bihor County

General Contractor: STRABAG

Executed works: drywall partitions, ceilings, drywall ceilings, screeds, masonry, painting, mechanized plasters, thermosystems, ceilings, leveling compound.

Project: developed during May 2016 – November 2016

Oregon Park

Oregon Park – Office ensemble property, made up of two buildings (2B+GF+6F)

Pipera Road, No. 46-48, District 2, Bucharest

General Contractor: STRABAG

Executed works: professional drywall systems, drywall paintings, plaster paintings, mechanized plasters.

Project: developed during October 2015 – December 2015

Gara Herastrau Office Building

Gara Herastrau Office Building

Gara Herastrau – Office building and parking (3B+GF+11F+1T)

Gara Herastrau Street, No. 4B, District 2, Bucharest

General Contractor: BOG’ART

Executed works: plasterboard walls and ceilings, coffered ceilings, lamellar ceilings, drywall paintings, plaster paintings, mechanized plasters, decorative plasters, floating floors.

Project: developed during November 2015 – July 2016

Green Court Bucharest

Green Court Bucharest A si B – Office buildings class A

Gara Herastrau, No.4, sector 2

General Contractor: SKANSKA CONSTRUCTION ROMANIA

Executed works: Drywall cladding. The complex includes two buildings completed in Phase I development. The first building was completed in early 2014 with GF + 12 levels and 3 levels of underground parking with 266 places, and a total area of approx. 19,500 sqm and the second building has all GF + 12 levels and 3 levels of underground parking with 315 places, and a total area of approx. 18,000 sqm .

Project: developed during November 2013 – September 2015

Bellevue Copou

Bellevue Copou – Apartment building B4

Fagului Street, No.5, Iasi

General Contractor: BOG’ART

Executed works: interior partitions of brick and drywall, plasters, paintings, decorative plastering, cladding walls and ceilings, mounting tiles and parquet, thermal facade.

Project: developed during March 2015 – June 2015

Bucharest Business Park

Office ensemble property, made up of four buildings (2B+GF+4F)

Bucuresti – Ploiesti Road, No.1, district 1, Bucharest

General Contractor: CONSOLA GRUP CONSTRUCT

Executed works: interior partitions of brick and drywall, cladding walls and ceilings.

Project: developed during March 2005 – September 2006

Tower Center Office

Bucharest Tower Center International Office – Office Building 3B+GF+22F+3T

Ion Mihalache Boulevard, No. 15-17, District 1, Bucharest

General Contractor: BOG’ART

Executed works: Professional drywall systems, drywall paintings, plasterboard walls with single/double/triple plating, dry plastering, floating floors.

West Logistic Park

Bucharest West Logistic Park: Office Buildings and industrial spaces

Bucuresti-pitesti Highway, km. 14

General Contractor: CONSOLA GRUP CONSTRUCT

Executed works: Professional drywall systems, plasterboard walls with a height of 12 m .

Project: developed during November 2006 – February 2007

Caderea Bastiliei

Caderea Bastiliei – Residential building B+GF+5F+6R

Caderea Bastiliei Street, No. 43, District 1, Bucharest

General Contractor: CONSOLA GRUP CONSTRUCT

Executed works: Professional drywall systems, drywall paintings, plasterboard walls, ceilings

Project: developed during March 2008 – May 2009

Cartier german Residenz

German district „Residenz” – Residential complex

Banatului Road, No.14, Chitila, Ilfov County

General Contractor: HEBERGER CONSTRUCTII

Executed works: Drywall systems and paintings for Phase III of the development – 3 buildings (24, 26, 27) and Phase IV – 8 buildings (39, 40, 41, 42, 43, 44, 45, and 46)

Project: developed during September 2008– April 2009

City Center Residence

City Center Residence: Residential complex B+GF+4F+2T

Intrarea Ovidiu Street, No.6, district 4, Bucharest

General Contractor: CONSOLA GRUP CONSTRUCT

Executed works: Drywall soffits, ceilings, walls, drywall partitions and cladding

Project: developed during March 2006 – September 2007

Dental Med

Dental Med – Commercial space

13 Septembrie Path, No.102, district 5, Bucharest For the whole

Project: ADMA Grup was the only specialist contractor for interior finishing : plasterboard ceilings and suspended level, coffered mineral fiber ceilings, paintings, plasters , screeds , assembly tiled floors , walls cladding with HPL Trespa.

Project: developed during June 2010 – May 2011

FeliCity

Feli City – Residential complex

Opalului Road, No.1-43, district 1, Bucharest

General Contractor: BOG’ART

Executed works: Plasterboard walls (8.000 sqm) and suspended ceilings (1.600 sqm), plasters (22.300 sqm), plasterings (33.400 sqm), paintings (34.500 sqm).

Project: developed during December 2010 – April 2012

Ford Daventry College

Ford Daventry College – Industrial hall

Ford Royal Oak Way South Ind Est Daventry, UK

General Contractor: INDEC UK

Executed works: Plasterboard walls on metal structure, ceilings, interior finishing

Project: developed during February 2015 – June 2015

Green Vista

Green Vista – Residential complex (three buildings)

Pipera Tunari Road, No.198C, Voluntari, Ilfov County

General Contractor: CONSOLA GRUP CONSTRUCT

Executed works: Drywall systems, partition walls, cladding walls with drywall, ceilings, soffits, gypsum masks, other systems – approx. 50,000 square meters on all three buildings; painting works; PAL cladding walls in the lobby area ( staircase ); ventilated facade system made of HPL fixed EUROFOX colored rivets – approx. 700 sqm.

Project: developed during May 2008 – Aprilie 2012

Minovici

Minovici – Residential house B+GF+4F+attic

Dr. Mina Minovici Street, No. 5, District 1, Bucharest

General Contractor: ART GROUP

Executed works: Drywall partitions and cladding , paintings.

Project: developed during November 2007 – March 2009

New Town Residential

New Town Residential – Residential building B+GF+12F+T, Phase II

Dristorului Street, No. 91, District 3, Bucharest

General Contractor: BOG’ART

Executed works: Drywall partitions and cladding with gypsum and finishing works ( grouting and painting ), plasters, facade .

Project: developed during June 2011 – April 2012

Sema Parc

Sema Parc – Office buildings class A

Splaiul Independentei Boulevard, No. 319, District 6, Bucharest

General Contractor: CONSOLA GRUP CONSTRUCT For the whole

Project: ADMA Grup was the only specialist contractor for interior finishing: professional installation of drywall systems, making a total of approx. 100,000 sqm drywall (walls , ceilings, soffits , smokescreen , masks, parapets ); paintings; raised technical floors – MDF and SCA; ceilings and hanging drywall level, coffered mineral fiber ceilings; moldings . The complex includes two buildings completed in Phase I development . The first building was completed in trim. II of 2008 , with GF + 8 floors and a total area of approx. 16,500 sqm and the second building, with GF + 8/14 floors and a total area of approx. 33,000 sqm .

Project: developed during July 2007 – August 2009

Tipografilor S-Park

Tipografilor Business Park (S-Park): Office Buildings (4 main buildings and 3 connecting buildings)

Tipografilor Street, No. 11-13-15, Disctrict 1, Bucharest

General Contractor: ACMS S.A.

Executed works: partition walls, cladding walls with drywall ( 3,500 sqm ), suspended ceilings ( 4,000 sqm), assembly coffered ceilings (5,000 sqm), HS 50 TEKTALAN thermal installation for ceiling mounting raised technical floor .

Project: developed during September 2006 – June 2007

Porsche Showroom

Showroom Auto Porsche – Commercial space

Pipera-Tunari Road, No. T49, Voluntari, Ilfov County

General Contractor: STRABAG

Executed works: Professional drywall systems, coffered mineral fiber ceilings, paintings, dig and floors.

Project: developed during November 2012 – February 2013

FCC Office Building

FCC Office Building

Calea Floreasca, No. 246C, district 1, Bucharest

General Contractor: STRABAG

Executed works: professional drywall systems, partition walls, cladding drywalls, ceilings, bullet-proof wall

Project: developed during February 2012 – December 2012

E.ON Targu Mures

E.ON Targu Mures – Office building Class A, B+GF+8F+T

Justitiei Street, No.12, Targu Mures, Mures County

General Contractor: BOG’ART

Executed works: professional drywall systems, drywall soffits, ceilings, walls, groutings, paintings.

Project: developed during July 2015 – October 2015

US Embassy

US Embassy

Ambasada SUA – special project

Bucuresti-Ploiesti Road, No. 42-44, District 1, Bucharest

General Contractor: BOG’ART

Executed works: cladding walls with drywall, plasterboard walls and ceilings wool, dry plaster , manual and mechanized, ceilings and laminated, paintings, plasterings, ceramic tiles, polystyrene on interior walls.

Project: developed during June 2010 – May 2011

Gebauer & Griller Balti

Gebauer & Griller Balti – Industrial hall

Balti, Republic of Moldova

General Contractor: ICS STRABAG

Executed works: professional drywall systems, metal coffered ceilings,paintings, dig and floors, flooring underlay over dig, tiles instalation.

Project: developed during February 2013 – December 2013

Peek & Cloppenburg

Peek & Cloppenburg – Commercial space

Promenada Mall, No. 242-246B, District 1, Bucharest

General Contractor: STRABAG

Executed works: professional drywall systems ( partition walls, cladding walls with drywall, ceiling )

Project: developed during April 2013 – July 2013

VCST Alba Iulia

VCST Automotive Production Alba

Calea Ciugudului Street, No. 9, Alba Iulia, Alba County

General Contractor: INDEC RO

Executed works: plasterboard walls on metal structure, ceilings, waterproofing, painting works, Dry plasters.

Project: developed during March 2017 – June 2017

LIDL OFFICES – Company headquarters

LIDL OFFICES – Company headquarters

Alexandru Serbanescu Street, No. 58, District 1, Bucharest

General Contractor: SKANSKA CONSTRUCTION ROMANIA

Executed works: drywall systems (partition walls, cladding walls with drywall, ceilings, soffits, masks, other systems drywall, flooring and interior), grouting, masonry structures

Project: developed during November 2016 – June 2017

The Mark – Grivita TOWER

The Mark – Grivita TOWER

Daniel Rosenthal Street, No. 39, District 1, Bucharest

General Contractor: STRABAG

Executed works: Interior partitions walls, Multilayered walls, ceilings and plastering works, painting works, dry plaster.

Project: May 2017 – September 2017

ONE Charles de Gaulle Residence

The Mark – Grivita TOWER

Daniel Rosenthal Street, No. 39, District 1, Bucharest

General Contractor: STRABAG

Executed works: Interior partitions walls, Multilayered walls, ceilings and plastering works, painting works, dry plaster.

Project: May 2017 – July 2018

References

Consola 2011

Consola 2011

Heberger 2011

Heberger 2011

Heberger 2013

Heberger 2013

Heberger 2015

Heberger 2015

Kanuf 2015

Kanuf 2015

Saint Gobain

Saint Gobain

Skanska 2015

Skanska 2015

Strabag 2013

Strabag 2013

Strabag 2015

Strabag 2015

Strabag Mueller 2015

Strabag Mueller 2015

Strabag Schmuck 2015

Strabag Schmuck 2015

Total Soft 2011

Total Soft 2011